OUR
PROJECTS
Every cable we pull gets tested, labeled, and documented. These aren't renders or stock photos. This is what our work actually looks like.

Medical Office Building
Pinellas County, FL • Floors 1, 3 & 4 • Three-Building Medical Campus
Three floors, 820+ drops, redundant fiber to every closet. Nurse call on Floor 1. Ceiling grid sequencing issues on Floor 4. Eight months start to finish.
View Project
Medical Imaging Center
Pinellas County, FL • Ground Floor of Parking Structure
Parking garages are not easy cabling environments. Water collects in conduits. Overhead runs require lifts. All between-building ties were indoor/outdoor rated.
View Project
Wound Care Center
Pinellas County, FL • Ground Floor of Parking Structure • Medical Campus
Same garage, same challenges. Water in conduits, lift work overhead, construction materials blocking the space you need to stand in.
View Project
Metals Manufacturer
Oldsmar, FL • Aluminum Foundry & Extrusion Facility • Office Buildout
An aluminum foundry doesn't stop pouring metal because someone needs to pull cable. We worked around live production across a two-story office and deep into the warehouse.
View Project
Hospital Pharmacy
St. Petersburg, FL • Active Hospital • Pharmacy Renovation
Pharmacies need more cameras than any other healthcare space. The ceiling was packed with existing electrical conduit. Quality cable and correct separation distances made the difference.
View Project
Private School Expansion
Land O' Lakes, FL • Two-Story Addition • Production Studio & Classrooms
Color-coded jacks so IT knows what's plugged into what. Full fire alarm scope including AHJ inspection and state elevator sign-off. Production studio wiring for a school that takes media seriously.
View Project
Hospital Floor Renovation
St. Petersburg, FL • Active Hospital • Single Floor Renovation
Half the floor was under construction. The other half was treating patients. Environmental Control Units, infection control protocols, and zero room for shortcuts.
View Project
Biological Research Lab
St. Petersburg, FL • Active Research Laboratory • Clean Room Protocols
The IT team was 1,000 miles away. Clean room protocols in sensitive areas. Two weeks from start to turnover.
View Project
Fine Dining Restaurant
Sarasota, FL • New Construction • Commercial Kitchen Cabling
Fifty drops in a national chain fine dining location. New construction, commercial kitchen included. Four days on-site, start to certified turnover.
View Project
Architectural Consulting Firm
Fort Myers, FL • Office Gut Renovation • Downtown Office Building
Eighty drops in a gut renovation for a national firm in Fort Myers. Same client. Different city. TSS travels anywhere in Florida.
View Project